[REPORT REGARDING FUNCTIONAL CHECKOUT AND TROUBLESHOOTING INSTRUCTIONS FOR M60A1E2 TANK STABILIZED GUN CONTROL SYSTEM REVIEW DRAFT] |
|
[ROUTING SLIP FROM JAMES A.MCCALLISTER TO BRAMAN REGARDING UNDETERMINED WITH ATTACHMENTS] |
|
[MEMORANDUM FOR RECORD FROM UNDETERMINED REGARDING LONG RANGE COMBAT VEHICLE EVALUATION WITH ATTACHMENTS] |
|
[ITEM MOVED TO OVERSIZE JOIN STORAGE BOX 16 X 20 BOX 9 FOLDER 9] |
|
[MANUSCRIPT] WHAT WAS YOUR MOST FRUSTRATING EXPERIENCE WITH MAINTENANCE PROCEDURES/OPERATIONS? |
|
[REPORT] ADVANCE PRELIMINARY REPORT CONTROL PROGRAM - APC'S AND TANKS - RVN [WITH ATTACHMENTS] |
|
[NOTES REGARDING COMBAT TANK AND M113/113A1 ARMORED PERSONNEL CARRIER OPERATIONAL HISTORY IN VIETNAM], MAJOR FOURSON, AND TB 750-97/98/99 REPAIR EXPENDITURE LIMITS] |
|
[PAGE TWO OF SELECTED REPAIR PARTS STUDY TANK FAMILY WITH ATTACHMENT] |
|
[NOTES REGARDING STEERING COMMITTEE MINUTES OF MEETING DA STUDY 17-66 LOGISTICAL EVALUATION OF COMBAT VEHICLES WITH ATTACHMENTS] |
|
[MANUSCRIPT] PRESENT SYSTEM |
|
[HANDWRITTEN NOTES REGARDING UNDETERMINED] |
|
[TABLE]M60 A1, AVERAGE LIFE OF ENGINE AND TRANSMISSION |
|
[COPY] [GRAPH REGARDING FAILURES AND MILES WITH ATTACHMENTS] |
|
[CORRESPONDENCE FROM COLONEL HERALD B. GALLINGER TO UNDETERMINED REGARDING RESEARCH AND ANALYSIS MANUAL OPERATION, MAINTENANCE, AND LIFETIMES OF M60 TANKS, M113 ARMORED PERSONNEL CARRIERS, AND M88 TANK RECOVERY VEHICLES VOLUME II WITH ATTACHMENT] |
|
[CHART] M60 TANK MAINTENANCE HOURS PER 100 MILES OPERATION; MILEAGE INCREMENT [WITH ATTACHMENTS] |
|
[MANUSCRIPT] VEHICLE CLASSIFICATION FOR MAP -TRANSPORT LIST OF CURRENT FLEET VEHICLES |
|
COMBAT VEHICLE MAINTENANCE STUDY AND TEST USAREUR |
|
[PART TWO OF REPORT REGARDING FUNCTIONAL CHECKOUT AND TROUBLESHOOTING INSTRUCTIONS FOR M60A1E2 TANK STABILIZED GUN CONTROL SYSTEM REVIEW DRAFT] |
|
[NOTES REGARDING VARIOUS] |
|
[CHART] A BASIC PROBLEM IN DETERMINING EQUIP AND UNIT READINESS |
|