[REPORT] ENGINEERING STUDY PROPOSAL AND/OR MALFUNCTION PLAN OF INVESTIGATION |
|
[NOTE] BATTELLE TEAMING CANDIDATES WITH ATTACHMENTS] |
|
[CORRESPONDENCE FROM GEORGE SCHECTER TO PROFESSOR BARRETT REGARDING "CIVIL AFFAIRS" ARTICLE] |
|
[CORRESPONDENCE FROM GEORGE SCHECTER TO KEVIN REGARDING CONTACT WITH ED WRIGHT, WITH ATTACHMENTS] |
|
[CORRESPONDENCE FROM J.R. LANE TO BOB REGARDING LIST OF REPORTS] |
|
[COPY][INSIDE THE PENTAGON REGARDING ASSISTANT SECRETARY OF THE NAVY - RESEARCH, DEVELOPMENT AND ACQUISITION CHART] |
|
[COPY][MEMORANDUM FROM B. TULLINGTON TO VARIOUS REGARDING SUMMARY OF 192 ACTIVITY APRIL 1990] |
|
[REPORT] BATTELLE RESUMES |
|
SUMMARY REPORT, VOLUME I, EVALUATION OF FIDS AND COMMERCIAL PHYSICAL SECURITY EQUIPMENT |
|
[MEMORANDUM FROM GEORGE SCHECTER TO BILL SCHILLING REGARDING 47TH MORS SPECIAL SESSION: "IMPACT OF TECHNOLOGY ON WARFARE"] |
|
[REPORT] SECTION IX-MINES |
|
[NOTE REGARDING OFFER FOR A MINE DESIGN MANUAL, WITH ATTACHMENT] |
|
[CORRESPONDENCE FROM GEORGE SCHECTER TO R. E. LINK REGARDING COPIES OF INFORMATION PROVIDED] |
|
[COPY][CORRESPONDENCE FROM UNDETERMINED TO JOE BROWN REGARDING VARIOUS] |
|
[CORRESPONDENCE FROM GEORGE SCHECTER TO LEONARD SULLIVAN REGARDING SUCCINCT STATEMENT OF THE PRINCIPLES WITH ATTACHMENTS] |
|
[COPY][CORRESPONDENCE FROM GEORGE SCHECTER TO DAVID P. PORRECCA REGARDING QUALIFICATIONS] |
|
[COPY] [CORRESPONDENCE FROM PAUL W. NEAL TO MAJOR JONES REGARDING BASIC FIDS DISTRIBUTION PLAN, WITH ATTACHMENTS] |
|
[FACSIMILE TRANSMITTAL HEADER FROM COLONEL E. LEE TO GEORGE SCHECTER REGARDING OSD LABORATORY STUDY GROUP] |
|
[REPORT] SECTION XIV-PLANT WORK LOADING |
|
[STUDY REPORT] CONAF III, BUILT-UP AREA CONFLICT |
|