| VOLUME I TECHNICAL PROPOSAL SYSTEM/HARDWARE INTEGRATION AND MANAGEMENT SCIENCE SUPPORT, PROGRAM AREA I: COMBINED ARMS SUPPORT AND ENGINEER SUPPORT |
|
| VEHICLE CHARACTERISTICS SHEET, M50, TYPE A, BB-1 (MECHANICAL RAM), REPEATING RECOILLESS RIFFLE, MAGAZINE TYPE |
|
| USMC COMMENTS [WITH ATTACHMENT] |
|
| TOW PROJECT |
|
| TOW MANUAL |
|
| TECHNICAL REPORT, PROJECT NUMBER C3008, FINAL REPORT, APPLYING THE DELPHI METHOD TO THE COLLECTION OF RISK ANALYSIS DATA |
|
| TECHNICAL REPORT NUMBER 461 SYSTEM ERROR BUDGETS, TARGET DISTRIBUTIONS AND HITTING PERFORMANCE ESTIMATES FOR GENERAL-PURPOSE RIFLES, AND SNIPER RIFLES OF 7.62 X 51 MM AND LARGER CALIBERS |
|
| TECHNICAL REPORT NUMBER 461 SYSTEM ERROR BUDGETS, TARGET DISTRIBUTIONS AND HITTING PERFORMANCE ESTIMATES FOR GENERAL-PURPOSE RIFLES, AND SNIPER RIFLES OF 7.62 X 51 MM AND LARGER CALIBERS |
|
| TECHNICAL REPORT 1340-TR-01, TACTICAL DETERRENCE MODEL: APPLICATION TO MINE SYSTEMS |
|
| TECHNICAL REPORT 1340-TR-01, TACTICAL DETERRENCE MODEL: APPLICATION TO MINE SYSTEMS |
|
| TECHNICAL REPORT 1232-B VOLUME II, DESCRIPTION OF FIRE CONTROL MAINTENANCE OPERATIONS PROCEDURES SHOP (FC MOP SHOP) INSTALLED IN BUILDING 208 ROCK ISLAND ARSENAL |
|
| TECHNICAL REPORT |
|
| TECHNICAL REPORT |
|
| TECHNICAL REPORT |
|
| TECHNICAL REPORT |
|
| TECHNICAL QUOTATION, PHYSICAL SECURITY SUBSYSTEMS ANALYSIS |
|
| TECHNICAL PROPOSAL, VOLUME 1, DEPARTMENT OF DEFENSE MASTER PLAN FOR PHYSICAL SECURITY [PART 1 OF 2, WITH ATTACHMENTS] |
|
| TECHNICAL PROPOSAL, VOLUME 1, DEPARTMENT OF DEFENSE MASTER PLAN FOR PHYSICAL SECURITY [PART 1 OF 2, WITH ATTACHMENTS] |
|
| TECHNICAL PROPOSAL, PART 1, COMPILATION AND ASSESSMENT OF WOUNDING CHARACTERISTICS AND POTENTIAL OF FOREIGN WEAPONS [WITH ATTACHMENTS] |
|
| TASK STATEMENT MINE PROGRAM REVIEW |
|