| [MEMORANDUM FROM UNDETERMINED TO UNDETERMINED REGARDING I CORPS REGARDING CP (CAMP ROBERTS) WITH ATTACHMENT] |
|
| [MEMORANDUM FROM UNDETERMINED TO UNDETERMINED REGARDING DEFINITION OF MANEUVER CONTROL SYSTEM 2 (DCCS) PROGRAM PLAN WITH ATTACHMENTS] |
|
| [MEMORANDUM FROM UNDETERMINED TO UNDETERMINED REGARDING BRIGADIER GENERAL WAKELIN VISIT] |
|
| [MEMORANDUM FROM UNDETERMINED TO MS. SOUTHARD REGARDING MODIFICATION OF BASE DEFENSE MEASUREMENT SUPPORT CONTRACT WITH ATTACHMENT] |
|
| [MEMORANDUM FROM UNDETERMINED TO COLONEL DACUNTO REGARDING HIGH TECHNOLOGY TEST BED WITH ATTACHMENTS] |
|
| [MEMORANDUM FROM UNDETERMINED TO CHIEF HTTB AND DEPUTY CHIEF HTTB REGARDING CHIEF OF STAFF/CG'S COMMENTS ON THE HIGH TECHNOLOGY LIGHT DIVISION INTERIM PROBLEM REPORT 5 AUGUST 1982 WITH ATTACHMENTS] |
|
| [MEMORANDUM FROM THOMAS D. SCOTT TO PM - OPERATIONS TACTICAL DATA SYSTEM FIELD OFFICE REGARDING REQUEST FOR DUPLICATE OBLIGATION DOCUMENTS] |
|
| [MEMORANDUM FROM THOMAS D. SCOTT TO LIEUTENANT COLONEL CARRIGO REGARDING VALIDATION OF $700K OMA FOR CABER FLASH FORCE DEVELOPMENT TESTING AND EVALUATION WITH ATTACHMENT] |
|
| [MEMORANDUM FROM THE DEPARTMENT OF THE ARMY, DEPUTY CHIEF OF STAFF FOR OPERATIONS AND PLANS TO DEPUTY COMMANDER, ARMY DEVELOPMENT AND EMPLOYMENT AGENCY REGARDING DEVELOPMENT AND EMPLOYMENT AGENCY PROGRAM] |
|
| [MEMORANDUM FROM THE DEPARTMENT OF THE AIR FORCE, HEADQUARTERS TO DEPUTY COMMANDER, ARMY DEVELOPMENT AND EMPLOYMENT AGENCY REGARDING AUTOMATED AIR-LOAD SYSTEM AND DMES COMPARISON] |
|
| [MEMORANDUM FROM TAFT RING TO PM, OPERATIONS TACTICAL DATA REGARDING "LET'S MAKE A DEAL" OR AVAILABILITY OF HP320/310 HARDWARE WITH ATTACHMENT] |
|
| [MEMORANDUM FROM SALVATORE F. LAFORGIA TO PROJECT MANAGER, OPERATIONS DATA SYSTEM REGARDING MANEUVER CONTROL SYSTEM 2.0 INTEGRATED LOGISTICS SUPPORT PLAN (ILSP) WITH ATTACHMENT] |
|
| [MEMORANDUM FROM ROBERT D. GALLOWAY TO LIEUTENANT COLONEL CARRIGO REGARDING STATUS OF MANEUVER CONTROL SYSTEM 2.0 UNFUNDED ITEMS] |
|
| [MEMORANDUM FROM RISCASSI TO VICE CHIEF OF STAFF OF THE ARMY REGARDING AUTOMATED C2 PROGRESS REPORT WITH ATTACHMENT] |
|
| [MEMORANDUM FROM RING TO STEVE STEINHAUER REGARDING REQUIREMENTS TO FIELD DISTRIBUTED COMMAND AND CONTROL SYSTEM WITH ATTACHMENT] |
|
| [MEMORANDUM FROM RING TO DEPUTY, COMMANDER, ARMY DEVELOPMENT AND EMPLOYMENT AGENCY REGARDING INITIALS IMPRESSIONS FROM BRIGADIER GENERAL WAKELINE WITH ATTACHMENT] |
|
| [MEMORANDUM FROM RING TO BRIGADIER GENERAL WAKELIN REGARDING AIR COMBAT CONTROL SYSTEM TEST BED START UP WITH ATTACHMENT] |
|
| [MEMORANDUM FROM RING TO BRIGADIER GENERAL RENO REGARDING AGENDA FOR MANEUVER CONTROL SYSTEM MERGER WORKING GROUP MEETING MONDAY AT FORT LEAVENWORTH WITH ATTACHMENT] |
|
| [MEMORANDUM FROM RING TO BILL JOHNSON REGARDING UNITED STATES ARMY EUROPE COMMAND AND CONTROL WITH ATTACHMENT] |
|
| [MEMORANDUM FROM RECORD REGARDING HIGH TECHNOLOGY LIGHT DIVISION FORCE STRUCTURE CONFERENCE] |
|