[WIDE SHOT OF OCCUPIED WATER VESSELS MOVING IN A BODY OF WATER] |
|
[CLOSE-UP SHOT OF SOLDIER WATCHING TWO OTHER SOLDIERS USE AN OPERATING HEADLINER] |
|
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
[MEDIUM SHOT OF CHARLES O. GRAY] |
|
[FULL SHOT OF MODEL MINE DETECTOR ON DISPLAY ON GRASS] |
|
[PHOTO][(FULL SHOT) CHIMNEY, MID-FALL, DURING DEMOLITION][WITH ATTACHMENTS] |
|
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,800 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
[PHOTOGRAPH OF ENGINEERS WORKING TO LOAD TRUCKS WITH 20FT. SECTIONS OF PIPE STACKED IN ORGANIZED PILES] |
|
[PHOTO][HEAD AND SHOULDER SHOT COLONEL HAROLD T. HENSON] |
|
[PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
[PHOTOGRAPH OF A MILITARY CONVOY PARKED BESIDE A SECTION OF THE PIPELINE TO GAS UP THEIR VEHICLES FROM THE ATTACHED PUMP HOSES] |
|
[PHOTO][HEAD AND SHOULDER SHOT LIEUTENANT COLONEL CHARLES R. KING] |
|
[MEDIUM SHOT OF LIEUTENANT COLONEL LINDENBURGH J. BELL IN UNIFORM] |
|
[PHOTO][(FULL SHOT) ENGINEER OFFICERS CONSTRUCTING A T/6 BUILDING][WITH ATTACHMENT] |
|