Drawer 20182370 (Page 33)

(View all drawers)
Title Documents
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[FULL SHOT OF FOUR SOLDIERS WATCHING ANOTHER SOLDIER DRAFT A LAYOUT ON PAPER]
[PHOTOGRAPH OF TWO SOLDIERS WORKING TOGETHER TO REMOVE A BOOBY-TRAPPED MINE FROM SAN JOSE BEACH IN THE PHILIPPINES]
[REPORT EXCERPT] STATISTICAL SUMMARY PERSONNEL STRENGTH UNITED STATES ARMY ENGINEER SCHOOL]
[PHOTO][(FULL SHOT) SOLDIERS LOADING UNIDENTIFIED CONTAINER ON BED OF TRUCK WITH ASSISTANCE OF CRANE]
[PHOTOGRAPH OF A LINE OF FOOTINGS UNDER CONSTRUCTION THAT WILL SUPPORT A HANGAR]
[PHOTOGRAPH OF ENGINEERS WORKING WITH A SECTION OF A PREFABRICATED RAILROAD BRIDGE AND CONNECTING CABLES]
[PHOTO][(FULL SHOT) TWO UNIDENTIFIED SOLDIERS TESTING SOIL][WITH ATTACHMENT]
[PHOTO][(WIDE SHOT) HEAVY EQUIPMENT STORAGE][WITH ATTACHMENTS]
[THREE QUARTER SHOT OF SOLDIER SITTING ON A CHAIR WHILE HANDLING A RIFLE NEXT TO A BUNK BED]
[PHOTOGRAPH OF ENGINEERS WORKING WITH AN EXCAVATOR AND WAGON DRILLS IN A QUARRY]
[MEDIUM SHOT OF LIEUTENANT COLONEL CHARLES R. KING IN UNIFORM]
[FULL SHOT OF BRIDGE ERECTION BOAT MANEUVERING OVER A BODY OF WATER]
[WIDE SHOT OF SOLDIERS REENACTING A SCENE OUTSIDE] [WITH ATTACHMENTS]
[PHOTOGRAPH - WIDE SHOT OF SOLDIERS WORKING ON A PONTOON BRIDGE BOTH FROM THE SHORE AND ON THE BRIDGE ITSELF]
[MEDIUM SHOT OF COLONEL FRED FLUCKIGER, JR. IN UNIFORM]
[PHOTO][(FULL SHOT) MR. BLUSH INSTRUCTING STUDENTS ON THE OPERATION OF THE MARTIN SCRAPER][WITH ATTACHMENT]
[MEDIUM SHOT OF SOLDIER SITTING WHILE LOOKING AT AN OBJECT]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTO][(FULL SHOT) SPECIALIST FOUR BURNE INSTRUCTING PRIVATE FIRST CLASS PALMER IN THE PROCEDURES OF MAKING CONTACT FILM][WITH ATTACHMENT]