| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 3,600 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 3,600 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 3,600 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 1,800 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 1,500 POUND LOAD IN 15 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED DURING RUNS THREE AND FOUR AT AN ARMY FACILITY] |
|
| [PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED AT AN ARMY FACILITY DURING RUN NUMBER 7] |
|
| [PHOTOGRAPH OF A PINE TREE BEING CLEARED FROM A FIELD WITH EXPLOSIVES TO MAKE ROOM FOR CONSTRUCTION] |
|
| [PHOTOGRAPH OF A PARTIALLY DESTROYED PILLBOX ON THE SIEGFRIED LINE THAT WAS DAMAGED BY ARMY ENGINEERS] |
|
| [PHOTOGRAPH OF A MILITARY CONVOY PARKED BESIDE A SECTION OF THE PIPELINE TO GAS UP THEIR VEHICLES FROM THE ATTACHED PUMP HOSES] |
|
| [PHOTOGRAPH OF A MILITARY CONVOY OF TRUCKS USING THE BURMA ROAD TO TRAVEL INTO CHINA] |
|
| [PHOTOGRAPH OF A MILITARY CONVOY AS SEEN FROM THE AIR WHILE ASCENDING A MOUNTAIN RANGE ON A SECTION OF THE BURMA ROAD THAT ZIG-ZAGS BACK AND FORTH] |
|
| [PHOTOGRAPH OF A MASSIVE CONCRETE HANGAR BEING BUILT WITH ALL OF THE FRAMEWORK UNDERNEATH VISIBLE AT THE UNFINISHED FRONT] |
|
| [PHOTOGRAPH OF A LINE OF INFANTRY SOLDIERS TRAVELLING OVER A HASTILY CONSTRUCTED CORDUROY ROAD IN THE SOUTH PACIFIC] |
|
| [PHOTOGRAPH OF A LINE OF FOOTINGS UNDER CONSTRUCTION THAT WILL SUPPORT A HANGAR] |
|
| [PHOTOGRAPH OF A HEAVILY CAMOUFLAGED TANK WITH A SOLDIER PEEKING OUT FROM THE SHRUBBERY PILED ON TOP] |
|
| [PHOTOGRAPH OF A GROUP OF SOLDIERS WORKING AROUND A QUARRY WITH LARGE PILES OF GRAVEL BEING MOVED BY BELTS ON LARGE MACHINES] |
|