Drawer 20182370 (Page 24)

(View all drawers)
Title Documents
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 600 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[FULL SHOT OF INSTRUCTOR POINTING TOWARDS INFORMATION ON A BOARD IN FRONT OF STUDENTS]
[PHOTO][(FULL SHOT) TWO STUDENTS REMOVING THE TAKEUP TUMBLER ON THE CRAWLER CRANE SHOVEL][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) TANK CROSSING BAILEY BRIDGE]
[COPY][REPORT REGARDING THE STATISTICAL ANALYSIS OF RESIDENT COURSES AT THE U.S. ARMY ENGINEER SCHOOL]
[PHOTOGRAPH OF TWO MASSIVE OIL TANKS UNDER CONSTRUCTION AT PIMS JETTY IN DUTCH NEW GUINEA]
[WIDE SHOT OF TANK TRANSPORTING A BRIDGE LAUNCHER OUTSIDE]
[WIDE SHOT OF SOLDIERS USING A CRANE TO MOVE A METAL BAR TO REPAIR A BRIDGE]
[FULL SHOT OF INTERNATIONAL HARVESTER UNIVERSAL ENGINEER TRACTOR ON DISPLAY OUTSIDE]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH NO LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[CLOSE-UP SHOT OF STORAGE AREA CONTAINING PARKED VEHICLES]
[WIDE SHOT OF TANK CARRYING A MOBILE BRIDGE COMPONENT TO ASSEMBLE A LARGER BRIDGE]
[FULL SHOT OF CATERPILLAR TRACTOR MODEL 12 ON DISPLAY OUTSIDE]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[COPY][GRAPH REGARDING THE CLOSED CIRCUIT TELEVISION INSTRUCTION UTILIZATION OF VIDEO TAPES]
[PHOTO][(THREE QUARTER SHOT) TWO SOLDIERS LOOKING AT QUADRANTS ON GLOBE][WITH ATTACHMENT]
[FULL SHOT OF SOLDIER KNEELING WHILE HANDLING A GASOLINE ENGINE NEXT TO ANOTHER SOLDIER STANDING]
[MEDIUM SHOT OF MAJOR GENERAL ROBERT R. PLOGER IN UNIFORM]
PHOTOGRAPH OF A RAFT WITH A MOTOR