[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 600 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
[FULL SHOT OF INSTRUCTOR POINTING TOWARDS INFORMATION ON A BOARD IN FRONT OF STUDENTS] |
|
[PHOTO][(FULL SHOT) TWO STUDENTS REMOVING THE TAKEUP TUMBLER ON THE CRAWLER CRANE SHOVEL][WITH ATTACHMENT] |
|
[PHOTO][(FULL SHOT) TANK CROSSING BAILEY BRIDGE] |
|
[COPY][REPORT REGARDING THE STATISTICAL ANALYSIS OF RESIDENT COURSES AT THE U.S. ARMY ENGINEER SCHOOL] |
|
[PHOTOGRAPH OF TWO MASSIVE OIL TANKS UNDER CONSTRUCTION AT PIMS JETTY IN DUTCH NEW GUINEA] |
|
[WIDE SHOT OF TANK TRANSPORTING A BRIDGE LAUNCHER OUTSIDE] |
|
[WIDE SHOT OF SOLDIERS USING A CRANE TO MOVE A METAL BAR TO REPAIR A BRIDGE] |
|
[FULL SHOT OF INTERNATIONAL HARVESTER UNIVERSAL ENGINEER TRACTOR ON DISPLAY OUTSIDE] |
|
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH NO LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
[CLOSE-UP SHOT OF STORAGE AREA CONTAINING PARKED VEHICLES] |
|
[WIDE SHOT OF TANK CARRYING A MOBILE BRIDGE COMPONENT TO ASSEMBLE A LARGER BRIDGE] |
|
[FULL SHOT OF CATERPILLAR TRACTOR MODEL 12 ON DISPLAY OUTSIDE] |
|
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY] |
|
[COPY][GRAPH REGARDING THE CLOSED CIRCUIT TELEVISION INSTRUCTION UTILIZATION OF VIDEO TAPES] |
|
[PHOTO][(THREE QUARTER SHOT) TWO SOLDIERS LOOKING AT QUADRANTS ON GLOBE][WITH ATTACHMENT] |
|
[FULL SHOT OF SOLDIER KNEELING WHILE HANDLING A GASOLINE ENGINE NEXT TO ANOTHER SOLDIER STANDING] |
|
[MEDIUM SHOT OF MAJOR GENERAL ROBERT R. PLOGER IN UNIFORM] |
|
PHOTOGRAPH OF A RAFT WITH A MOTOR |
|