ENGINEER INTELLIGENCE NOTES NUMBER 20 |
|
REPORT AFTER ACTION AGAINST ENEMY AS REQUIRED BY AR 345-105 |
|
[REPORT] WATER SUPPLY ANALYSIS |
|
HISTORY OF THE 109TH ENGINEER COMBAT BATTALION |
|
[BOOKLET] ENGINEER INTELLIGENCE NOTES NO. 14, SOVIET MINE WARFARE AND ENGINEER EQUIPMENT |
|
[CORRESPONDENCE FROM A. C. BATES JR TO THE ADJUTANT GENERAL REGARDING TRANSMITTAL OF HISTORICAL DATA] |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING ARCHITECTURAL; ENGINEERING SERVICES FOR THE CONSTRUCTION AT EDGEWOOD ARSENAL, MARYLAND] |
|
[MEMORANDUM] REGARDING THE ORGANIZATION, EQUIPMENT, TRAINING, PERSONNEL & PROBLEMS OF THE 83RD ENGINEER CONSTRUCTION BATTALION, FORT SILL, OKLAHOMA |
|
[REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "DETAILS OF UNITS, PLATES 115 - 167" DRAWINGS - PLATE 115 - 167] |
|
[MEMORANDUM] TRAINING MEMORANDUM NO. 1 |
|
[REPORT] INSPECTION OF EARLY AIRFIELDS BUILT IN NORTH AMERICA [WITH ATTACHMENT] |
|
[REPORT 162] |
|
[MEMORANDUM FROM HEADQUARTERS, FIFTEENTH ENGINEER BATTALION TO ASSISTANT CHIEF OF STAFF REGARDING LETTER OF TRANSMITTAL] [WITH ATTACHMENT] |
|
[REPORT] HISTORY 8033D REGIONAL POST ENGINEER SERVICE UNIT |
|
[COPY][MEMORANDUM FROM DEPARTMENT OF THE AIR FORCE TO PERSONNEL CONCERNED REGARDING LETTER ORDER C-507] |
|
[TABLE] T/O AND E EQUIPMENT AUTHORIZED AND ON HAND |
|
[COPY] ENGINEER TECHNICAL BULLETIN NO. 6 |
|
[LIST] APPENDIX A - APPOINTMENTS IN THE SCHOOL OF MILITARY ENGINEERING |
|
[REPORT]ASPHALT AIRFIELD CONSTRUCTION IN NORTH AFRICA [WITH ATTACHMENT] |
|
[REPORT "FINAL UNIT HISTORY OF THE 22ND ENGINEER REPRO. DETACHMENT"] |
|