[REPORT] FRESH WATER-SALT WATER DENSITY CURRENTS, A MAJOR CAUSE OF SILTATION IN ESTUARIES |
|
[REPORT REGARDING THE RAILWAY BRIDGE OVER THE RHINE RIVER VICTORY BRIDGE] |
|
[COVER] SCHOOL OF MILITARY ENGINEERING |
|
HISTORY-109TH ENGINEER C BATTALION-34TH INFANTRY DIVISION |
|
[REPORT] ANNEX A - PRIMARY ACTIVITIES OF INDIVIDUALS IN THE BATTLE GROUP AREA |
|
[CORRESPONDENCE FROM CAPTAIN NICHOLAS A. LORD TO UNDETERMINED REGARDING ANNUAL UNIT HISTORICAL REPORT] |
|
BAYER MANUAL |
|
[BOOKLET] ENGINEER INTELLIGENCE NOTES NO. 22, SOVIET ARMY ENGINEERS |
|
[BOOKLET] ENGINEER INTELLIGENCE NOTES NO. 10-1951, STREAM-CROSSING EXPEDIENTS OF NKPA AND CCF FOOT TROOPS |
|
CHAPTER ONE [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
[REPORT] OPERATIONS IN ITALY, DECEMBER 1943, 111TH ENGINEER COMBAT BATTALION [WITH ATTACHMENTS] |
|
REPORT OF CONSTRUCTION OF AIRFIELD LANDING STRIPS AT K-2, K-16, AND K-1, OF FIFTH AIR FORCE KOREA |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING ARCHITECTURAL; ENGINEERING SERVICES FOR CONSTRUCTION OF WAREHOUSE; TEXTILE MANUFACTURING BUILDING, WAREHOUSE, ADMINISTRATION BUILDING] |
|
[MEMORANDUM FROM HEADQUARTERS, FIFTEENTH ENGINEER BATTALION TO ASSISTANT CHIEF OF STAFF REGARDING LETTER OF TRANSMITTAL] [WITH ATTACHMENT] |
|
[REPORT "FORT BELVOIR ENGINEER SCHOOL DEPARTMENT OF ENGINEERING PERIOD 1 JULY TO 31 DECEMBER 1949"] |
|
[REPORT] RHINE CROSSING BY THE 79 INFANTRY DIVISION |
|
[BOOKLET] THE PROBLEM OF CLAY IN ROAD CONSTRUCTION |
|
[REPORT] THE WATER PROBLEM |
|
[REPORT] VOL. I EVALUATION OF SOILS AND PERMAFROST CONDITIONS IN THE TERRITORY OF ALASKA BY MEANS OF AERIAL PHOTOGRAPHS |
|
ENGINEER CONSTRUCTION BULLETIN #5, SUBSTITUTES FOR NISSEN AND ROMNEY HUTTING |
|