| [DRAFT] PLAN OF ORGANIZATION OF THE CONSTRUCTION DIVISION [WITH ATTACHMENT] |
|
| [DRAFT REPORT] ENGINEER SHORT PARTY OPERATIONS: |
|
| [DISPOSITION FROM ENGR REPR TO O/EQUIPMENT REGARDING HEAVY DROP OF ENGR CONSTRUCTION EQUIPMENT] |
|
| [DISPOSITION FORM FROM EDWARD J. BIELECKI TO 74TH ENGINEER HEAVY EQUIPMENT COMPANY REGARDING BILL OF MATERIALS FOR SU SONG BRIDGE WITH ATTACHMENTS] |
|
| [DIAGRAM] THE DEVELOPMENT OF THE MILITARY ROAD [WITH ATTACHMENT] |
|
| [DIAGRAM] SOYANG RIVER BAILEY BRIDGE |
|
| [DIAGRAM] REVISIONS |
|
| [DIAGRAM] REPAIR AND WIDENING [WITH ATTACHMENTS] |
|
| [DIAGRAM] REPAIR AND WIDENING [WITH ATTACHMENTS] |
|
| [DIAGRAM] RECONSTRUCTION - REINF. CONC. BRIDGE WONJU, KOREA [WITH ATTACHMENTS] |
|
| [DIAGRAM] RECONSTRUCTION - REINF. CONC. BRIDGE WONJU, KOREA [WITH ATTACHMENTS] |
|
| [DIAGRAM] PROPOSED TYPE D TRAINING AIDS SUBCENTER |
|
| [DIAGRAM] PROPOSED PINTAIL HIGHWAY BRIDGE AT CT 230098 [WITH ATTACHMENTS] |
|
| [DIAGRAM] NORTH PROJECT [WITH ATTACHMENTS] |
|
| [DIAGRAM] LOCK GATE CHAMBER [WITH ATTACHMENT] |
|
| [DIAGRAM] HEMORRHAGIC FEVER CENTER ELECTRICAL DISTRIBUTION [WITH ATTACHMENTS] |
|
| [DIAGRAM] GROOMS TRAMWAY [WITH ATTACHMENTS] |
|
| [DIAGRAM] DIAGRAMS APPENDIX D. [WITH ATTACHMENTS] |
|
| [DIAGRAM] DIAGRAM OF DEMOLITION CHARGES USED TO DESTROY TIDAL BASIN LOCKED GATES (4 JANUARY 1951) [WITH ATTACHMENT] |
|
| [DIAGRAM] AS BUILT PLANS OF CHUNCHON HWY. BRIDGE CS - 8994 [WITH ATTACHMENTS] |
|