Drawer 20182368 (Page 83)

(View all drawers)
Title Documents
[DRAFT] PLAN OF ORGANIZATION OF THE CONSTRUCTION DIVISION [WITH ATTACHMENT]
[DRAFT REPORT] ENGINEER SHORT PARTY OPERATIONS:
[DISPOSITION FROM ENGR REPR TO O/EQUIPMENT REGARDING HEAVY DROP OF ENGR CONSTRUCTION EQUIPMENT]
[DISPOSITION FORM FROM EDWARD J. BIELECKI TO 74TH ENGINEER HEAVY EQUIPMENT COMPANY REGARDING BILL OF MATERIALS FOR SU SONG BRIDGE WITH ATTACHMENTS]
[DIAGRAM] THE DEVELOPMENT OF THE MILITARY ROAD [WITH ATTACHMENT]
[DIAGRAM] SOYANG RIVER BAILEY BRIDGE
[DIAGRAM] REVISIONS
[DIAGRAM] REPAIR AND WIDENING [WITH ATTACHMENTS]
[DIAGRAM] REPAIR AND WIDENING [WITH ATTACHMENTS]
[DIAGRAM] RECONSTRUCTION - REINF. CONC. BRIDGE WONJU, KOREA [WITH ATTACHMENTS]
[DIAGRAM] RECONSTRUCTION - REINF. CONC. BRIDGE WONJU, KOREA [WITH ATTACHMENTS]
[DIAGRAM] PROPOSED TYPE D TRAINING AIDS SUBCENTER
[DIAGRAM] PROPOSED PINTAIL HIGHWAY BRIDGE AT CT 230098 [WITH ATTACHMENTS]
[DIAGRAM] NORTH PROJECT [WITH ATTACHMENTS]
[DIAGRAM] LOCK GATE CHAMBER [WITH ATTACHMENT]
[DIAGRAM] HEMORRHAGIC FEVER CENTER ELECTRICAL DISTRIBUTION [WITH ATTACHMENTS]
[DIAGRAM] GROOMS TRAMWAY [WITH ATTACHMENTS]
[DIAGRAM] DIAGRAMS APPENDIX D. [WITH ATTACHMENTS]
[DIAGRAM] DIAGRAM OF DEMOLITION CHARGES USED TO DESTROY TIDAL BASIN LOCKED GATES (4 JANUARY 1951) [WITH ATTACHMENT]
[DIAGRAM] AS BUILT PLANS OF CHUNCHON HWY. BRIDGE CS - 8994 [WITH ATTACHMENTS]