[REPORT] COMPARISON OF UNITED STATES AND SOVIET RIVER-CROSSING CAPABILITIES PART 2 |
|
ENGINEER INTELLIGENCE MEMORANDUM NUMBER 11 |
|
[REPORT] FROST INVESTIGATIONS: AN ANALYSIS OF ERRORS IN GROUND AND AIR TEMPERATURE MEASUREMENT |
|
REPORT AFTER ACTION WITH ENEMY |
|
[MEMORANDUM FROM CAPTAIN ZENUS W. RAFFIELD TO THE ADJUTANT GENERAL REGARDING UNIT HISTORY][WITH ATTACHMENT] |
|
[LISTING OF INCLUDED SUBJECTS IN MAJOR SUBJECT HEADINGS |
|
[REPORT "ENGINEER INTELLIGENCE SUMMARY NO. 43"] [DRAWING "GERMAN ELECTRIC IGNITER E.S. MI. Z. 40. FOR S. MINE"] |
|
INSTRUCTION MANUAL IN DETERMINATION OF GEOGRAPHIC POSITIONS BY STAR OBSERVATIONS |
|
[REPORT "ENGINEER INTELLIGENCE SUMMARY NO. 54"] |
|
[MEMORANDUM FROM HEADQUARTERS, FIFTEENTH ENGINEER BATTALION TO ASSISTANT CHIEF OF STAFF REGARDING LETTER OF TRANSMITTAL] [WITH ATTACHMENT] |
|
[REPORT "ENGINEER INTELLIGENCE SUMMARY NO. 40"] [DRAWING "GERMAN DRIFTING MINE"] |
|
[REPORT] PROJECT HISTORY, JAPAN CENTRAL EXCHANGE DEPOT, CHUNCHON, KOREA |
|
[COPY] [MEMORANDUM FROM HEADQUARTERS, 7TH ENGINEER BATTALION TO COMMANDING GENERAL REGARDING AFTER ACTION AGAINST THE ENEMY REPORT] |
|
[MEMORANDUM REGARDING OVERHEAR COVER] |
|
ANNUAL NARRATIVE REPORT |
|
[REPORT "DETAILED WEEKLY SCHEDULE - CLASS, PLUMBING COURSE"] |
|
ENGINEER TECHNICAL BULLETIN NUMBER 2 |
|
ENGINEER INTELLIGENCE SUMMARY NO. 63 |
|
[LIST OF PNEUMATIC TOOLS AND VARIOUS EQUIPMENT] |
|
[NOTES] PROBLEM NO. 2-THE EMPLOYMENT OF THE ENGINEER SEPARATE BATTALION (MAP PROBLEM) |
|