| [REPORT] THE STUDY OF THE APPLICABILITY OF THE SEISMIC METHOD FOR THE DETERMINATION OF THE UPPER SURFACE OF PERMAFROST |
|
| [REPORT] THE RHINE CROSSING-A SUMMARY OF SEVENTH ARMY ENGINEER ACTIVITIES LEADING UP TO AND DURING THE RHINE CROSSING |
|
| [REPORT] THE PECULIARITIES OF RELIEF AND MICRO-RELIEF OF THE REGION OF PERMAFROST DISTRIBUTION, CHAPTER 10, TRANSLATION OF RUSSIAN PUBLICATION |
|
| [REPORT] THE MAIN RIVER BRIDGE AT MARKT-HEIDENFELD, GERMANY [WITH ATTACHMENT] |
|
| [REPORT] THE MAIN RIVER BRIDGE AT MARKT-HEIDENFELD, GERMANY [WITH ATTACHMENT] |
|
| [REPORT] THE FUNDAMENTAL PROBLEMS OF PERMAFROST AND THE MEANS TO THEIR SOLUTION |
|
| [REPORT] THE ESTABLISHMENT AND MAINTENANCE OF TURF ON STABILIZED GRANULAR MATERIAL |
|
| [REPORT] THE CONSTRUCTION OF AN EARTH RAILROAD BED IN THE NORTHERN REGIONS UNDER PERMA-FROST CONDITIONS |
|
| [REPORT] TECHNIQUES FOR RAPID ROAD CONSTRUCTION USING MEMBRANE-ENVELOPED SOIL LAYERS |
|
| [REPORT] TECHNIQUES FOR RAPID ROAD CONSTRUCTION USING MEMBRANE-ENVELOPED SOIL LAYERS |
|
| [REPORT] TABLE OF BASIC ALLOWANCES FOR ENGINEERS, GENERAL SERVICE REGIMENT |
|
| [REPORT] SYNOPSIS OF EVENTS IN PREPARATION & CONSTRUCTION OF HEAVY PONTON BRIDGE ACROSS THE RHINE RIVER |
|
| [REPORT] SURFACE DRESSING OF SOIL FORMATIONS [WITH ATTACHMENT] |
|
| [REPORT] STUDY OF ICE FORMATION IN SOILS |
|
| [REPORT] STREAM GAGING METHODS AND EQUIPMENT FOR MILITARY PURPOSES |
|
| [REPORT] STOCKING ACCOUNTING WITHIN THE ZONE OF THE INTERIOR |
|
| [REPORT] STATISTICAL DATA FISCAL YEAR 1956 |
|
| [REPORT] STANDING OPERATING PROCEDURES FOR THE OFFICE OF THE CHIEF OF ENGINEERS DURING MAJOR FLOOD OR DISASTER |
|
| [REPORT] STANDING OPERATING PROCEDURE FOR THE SPECIALIST COURSES |
|
| [REPORT] STANDING OPERATING PROCEDURE FOR THE SPECIALIST COURSES |
|