[MANUAL] STRUCTURAL STEEL, OPEN-WEB JOISTS, AND LIGHT-GAGE STEEL FOR BUILDINGS |
|
[REPORT] PLAN FOR RHINE RIVER CROSSINGS BETWEEN WESEL AND DINSLAKEN |
|
[COPY] GENERAL ORDERS NUMBER 5 |
|
[REPORT] HISTORY 92D ENGINEER SERVICE COMPANY |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING CONSTRUCTION SERVICES FOR CONSTRUCTION OF ARMOR PLATE PLANT AT TACONY, PHILADELPHIA, PENNSYLVANIA] |
|
[OUTLINE] CALCULATIONS (APPENDIX C), ROADS, BRIDGES |
|
[REPORT] UNIT NARRATIVE HISTORICAL REPORT 1 JANUARY 1950 THROUGH 7 FEBRUARY 1950 |
|
ENGINEER INTELLIGENCE SUMMARY NO. 48 |
|
ENGINEER TECHNICAL BULLETIN NO. 5 |
|
UNIT HISTORY |
|
ENGINEER PERIODIC OPERATIONS REPORT NUMBER 24 |
|
[LABEL] OUTLINE PLAN FOR CROSSING THE RHINE RIVER |
|
[REPORT] DETERMINATION OF THERMAN PROPERTIES OF SOILS FOR INVESTIGATION OF AIRFIELD CONSTRUCTION IN ARCTIC AND SUBARCTIC REGIONS |
|
[REPORT] UNIT HISTORICAL REPORT |
|
[STUDY OF CORPS OF ENGINEERS ORGANIZATION FOR LOGISTICAL SUPPORT] |
|
[COPY] [REPORT] COMMAND REPORT AR 345-105 DATED 3 OCTOBER 1950 |
|
[REPORT OF THE ALBERT CANAL] |
|
[NEGATIVE COPY][REPORT] CONSTRUCTION DATA, GENERAL CONDITIONS |
|
[REPORT 162] |
|
ENGINEER INTELLIGENCE MEMORANDUM NUMBER 1 |
|