[COPY] SPECIAL ORDERS NUMBER 1 |
|
REPORT ON UTILITIES, OSAKA-KOBE-KYOTO AREA JAPAN |
|
[REPORT "ANNUAL HISTORICAL REPORT CSHIS-5 18 ENGINEER COMBAT BATTALION FOR THE PERIOD OF 15 AUGUST 1950 TO 31 DECEMBER 1950"] (DUPLICATE) [WITH ATTACHMENTS] |
|
[PHOTOGRAPH WIDE SHOT OF B.T.D. 6. INTERNATIONAL HARVESTER CRAWLER TRACTOR WITH DROTTSKID SHOVEL CLEARING RUBBLE WITH ATTACHMENTS] |
|
[MEMORANDUM FROM MAJOR CHARLES W. NEAGLE TO ADJUTANT GENERAL DEPARTMENT OF THE ARMY REGARDING UNIT HISTORICAL REPORT] [WITH ATTACHMENT] |
|
[REPORT] ENGINEER CONSTRUCTION IN THE SOUTHWEST PACIFIC AREA |
|
[REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] [DRAWING PLATE NO. 2] |
|
TECHNICAL TRAINING BULLETIN NO. 28 |
|
[INSTRUCTOR'S LESSON PLAN REGARDING MOTORS; GENERATORS] [WITH ATTACHMENTS] |
|
[REPORT] HISTORICAL DOCUMENT, HIGHWAY BRIDGE CS8894 ROUTE 18 SEOUL CHUNCHON |
|
[MEMORANDUM FROM CONSTRUCTION (COST-PLUS) TO CONSTRUCTION ADVISORY BRANCH REGARDING CONSTRUCTION PROGRAM AT ELMENDORF FIELD, ANCHORAGE, ALASKA] |
|
[TABLE] MATERIALS CONSUMED |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING ARCHITECTURAL; ENGINEERING SERVICES FOR NEW CONSTRUCTION; IMPROVEMENTS AT FRANKFORD ARSENAL, PHILADELPHIA, PENNSYLVANIA] |
|
FINAL TEAM REPORT CHAPTER TWO: MILITARY CONSTRUCTION |
|
[REPORT] PLAN FOR RHINE RIVER CROSSINGS BETWEEN WESEL AND DINSLAKEN |
|
ENGINEER INTELLIGENCE NOTES NUMBER 16 |
|
[COPY][MEMORANDUM FROM DEPARTMENT OF THE AIR FORCE TO PERSONNEL CONCERNED REGARDING LETTER ORDER C-694] |
|
[INSTRUCTOR'S LESSON PLAN REGARDING PRACTICAL ARITHMETIC] |
|
[BOOK "ESTIMATING DATA FOR BRIDGES AND MISCELLANEOUS ENGINEERING STRUCTURES"] [PART 2 OF 3] [PAGES 74-149] |
|
[CORRESPONDENCE FROM C. D. BREWER REGARDING "REPORT ON SOIL MECHANICS COURSE AT ROAD RESEARCH LABORATORY"] |
|