ENGINEER INTELLIGENCE SUMMARY NUMBER 7 |
|
[BOOKLET] ENGINEER INTELLIGENCE NOTES NO. 16, MILITARY CONSTRUCTION PRACTICES BY THE ENEMY IN KOREA |
|
ENGINEER TECHNICAL BULLETIN NUMBER 19 |
|
TRAINING CIRCULAR NO. 2 |
|
[REPORT] CONTRIBUTIONS TO THE METHOD OF STUDYING PERMAFROST FOR THE PURPOSES OF PROPOSED ENGINEERING CONSTRUCTIONS |
|
ENGINEER INTELLIGENCE SUMMARY NO. 81 |
|
[MEMORANDUM FROM COLONEL G.E. GALLOWAY TO COMMANDING GENERAL TEC REGARDING STUDY ON TRAINING AND EDUCATION OF OFFICERS ATTENDING THE ENGINEER SCHOOL] |
|
[REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] [DRAWING TENSION COUPLING FOR USE WITH RAIL TIES AS USED BY SOUTHERN RAILWAY FIG NO. 4] |
|
[REPORT REGARDING THE RAILWAY BRIDGE OVER THE RHINE RIVER VICTORY BRIDGE] |
|
ENGINEER INTELLIGENCE SUMMARY NO. 105 |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING ARCHITECTURAL-ENGINEERING SERVICES FOR THE CONSTRUCTION OF AN ORDNANCE DEPOT TO BE LOCATED IN MORROW; UMATILLA COUNTIES, OREGON] |
|
[REPORT] RE HEADQUARTER MESS |
|
[EXAM] COUNTY FAIR TEST |
|
[MEMORANDUM FROM WAR DEPARTMENT, OFFICE OF THE CHIEF OF ENGINEERS TO GENERAL KINGMAN REGARDING WEEKLY REPORT OF ACTIVITIES] |
|
INFORMATION BULLETIN NO. 31 |
|
[ORDERS] GENERAL ORDERS NUMBER 2 |
|
[APPENDIX E, MAP OF THE ASSAM-BURMA-CHINA PIPELINE] |
|
[MAP OF CONSTRUCTION AT AIR CORPS STATIONS, PART 1- TACTICAL UNITS][WITH ATTACHMENTS] |
|
[CORRESPONDENCE FROM CAPTAIN DONALD E. GILLIS TO UNDETERMINED REGARDING HISTORICAL REPORT] |
|
[REPORT] CONSTRUCTION AT AIR CORPS STATIONS, SUMMARIES OF PROGRESS, BI-MONTHLY [WITH ATTACHMENTS] |
|