[MEMORANDUM FROM HEADQUARTERS, FIFTEENTH ENGINEER BATTALION TO ASSISTANT CHIEF OF STAFF, G-3 REGARDING LETTER OF TRANSMITTAL] |
|
[REPORT] UNIFORM SOIL CLASSIFICATION, BASED ON CASAGRANDE CLASSIFICATION |
|
[REPORT] AIRFIELD CONSTRUCTION PROCEDURES AND STAFF TABLES |
|
ENGINEER INTELLIGENCE SUMMARY NUMBER 25 |
|
TECHNICAL TRAINING BULLETIN NO. 18 |
|
TECHNICAL TRAINING BULLETIN NO. 17 |
|
[REPORT REGARDING THE RAILWAY BRIDGE OVER THE RHINE RIVER VICTORY BRIDGE] |
|
HISTORY OF THE 109TH ENGINEER COMBAT BATTALION |
|
[MEMORANDUM FROM WAR DEPARTMENT, OFFICE OF THE CHIEF OF ENGINEERS TO GENERAL KINGMAN REGARDING WEEKLY REPORT OF ACTIVITIES] |
|
[REPORT] HISTORY OF 510TH EUD - 1949 |
|
[CORRESPONDENCE FROM CAPTAIN FRED FLUCKIGER, JUNIOR TO UNDETERMINED REGARDING HISTORY OF ORGANIZATION FOR 1950] |
|
ENGINEER CONSTRUCTION BULLETIN #12, IMPROVISED SMT-PBS HUTS |
|
ENGINEER PERIODIC OPERATIONS REPORT NUMBER 14 |
|
[REPORT "FORT BELVOIR ENGINEER SCHOOL DEPARTMENT MECHANICAL AND TECHNICAL EQUIPMENT PERIOD 1 JULY TO 31 DECEMBER 1949"] |
|
[REPORT] DIRECTIVES |
|
[REPORT] CONSTRUCTION REQUIREMENTS FOR OPERATIONS IN KOREA AS OF 1 OCTOBER 1950 [WITH ATTACHMENTS] |
|
[REPORT] NARRATIVE |
|
[MEMORANDUM] SUMMARY OF ANNUAL UNIT HISTORY |
|
[REPORT "ENGINEER INTELLIGENCE SUMMARY NO. 43"] [DRAWING "GERMAN R MINE 43 (A. TK.)"] |
|
[NOTES] PROBLEM NO. 4-FIELD FORTIFICATION AND CAMOUFLAGE [WITH ATTACHMENTS] |
|