REPORT ON UTILITIES, OSAKA-KOBE-KYOTO AREA JAPAN |
|
[REPORT] OPERATION "AVALANCHE" 9-21 SEPTEMBER 1943, ANNEX #14, 111TH ENGINEER BATTALION [WITH ATTACHMENTS] |
|
[COPY] [REPORT] 96TH ENGINEER DEPOT COMPANY, HISTORY OF ORGANIZATION FOR 1949 (WDSHD-2) |
|
[INSTRUCTOR'S LESSON PLAN REGARDING PRELIMINARY INTERIOR WIRING PRACTICES] [WITH ATTACHMENTS] |
|
[TABLE OF CONTENTS] |
|
[REPORT] VISIT TO ZONE OF OPERATIONS IN EASTERN FRANCE & LUXENBURG, JUL 9-13, 1940, MA REPORT NO. 17, 410 |
|
[DIAGRAM] DIAGRAM OF DEMOLITION CHARGES USED TO DESTROY TIDAL BASIN LOCKED GATES (4 JANUARY 1951) [WITH ATTACHMENT] |
|
HISTORY-109TH ENGINEER C BATTALION-34TH INFANTRY DIVISION |
|
ENGINEER INTELLIGENCE NOTES NO. 5 |
|
[NOTES] PROBLEM NO. 1-FIELD FORTIFICATIONS [WITH ATTACHMENTS] |
|
[CORRESPONDENCE FROM MAJOR GENERAL D. L. WEART TO UNDETERMINED REGARDING PROPOSED PLAN D FOR SCHOOL SYSTEM FOR ARMY OFFICERS] |
|
TRAINING MEMORANDUM |
|
[REPORT 162] |
|
[COPY] [MEMORANDUM FROM HEADQUARTERS, SECOND ENGINEER BATTALION TO ADJUTANT GENERAL REGARDING ACTION AGAINST THE ENEMY, REPORTS AFTER/AFTER ACTION REPORT] |
|
[PHOTOCOPY OF TURNBUCKLES FOR LOCK GATES] |
|
[REPORT] ANALYSIS OF TROOPS, EQUIPMENT AND TASKS INVOLVED PER CORPS IN CROSSING OF THE RHINE RIVER |
|
ENGINEER INTELLIGENCE SUMMARY NO. 46 |
|
[REPORT "ENGINEER INTELLIGENCE SUMMARY NO. 46"] [DRAWING "ERECTION OF CAMELS FEET AND FIRST PANEL STOREY ON RAFT"] |
|
[NOTES] PROBLEM NO. 3-MILITARY BRIDGES [WITH ATTACHMENTS] |
|
[REPORT] PORT OF CHERBOURG |
|