[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING ARCHITECTURAL-ENGINEERING SERVICES FOR THE CONSTRUCTION OF A LOADING PLANT FOR MINOR CALIBER SHELL AT UNION CENTER, INDIANA] |
|
[MEMORANDUM FROM LIEUTENANT COLONEL H.C. ROWLAND, JR. TO VARIOUS REGARDING OPERATIONS OF THE FRENCH EXPEDITIONARY CORPS IN MONTAINORS TERRAIN][WITH ATTACHMENTS] |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING CONSTRUCTION SERVICES FOR CONSTRUCTION OF A REPLACEMENT CENTER IN THE VICINITY OF GALVESTON, TEXAS] |
|
[REPORT] WATER SUPPLY ANALYSIS |
|
[BOOKLET] ENGINEER INTELLIGENCE NOTES, NO. 21, SOVIET S-80 TRACTOR |
|
[REPORT] CONSTRUCTION REQUIREMENTS FOR OPERATIONS IN KOREA AS OF 1 OCTOBER 1950 [WITH ATTACHMENTS] |
|
INFORMATION BULLETIN NO. 25 |
|
[REPORT 162] |
|
ENGINEER INTELLIGENCE NOTES NO. 10 |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING CONSTRUCTION SERVICES FOR NEW CONSTRUCTION; IMPROVEMENTS AT FRANKFORD ARSENAL, PHILADELPHIA, PENNSYLVANIA] |
|
[REPORT] PROPOSALS FOR THE TRAINING AND EDUCATION OF OFFICERS AT THE ENGINEER SCHOOL |
|
[MEMORANDUM FROM FIRST LIEUTENANT MURRILL E. HALE TO COMMANDING OFFICER 5TH ENGINEER CONSTRUCTION GROUP REGARDING ANNUAL UNIT HISTORICAL REPORT] |
|
ENGINEER PERIODIC OPERATIONS REPORT NUMBER 22 |
|
[REPORT] SALWEEN RIVER BRIDGE BURMA ROAD |
|
[BOOKLET] REPORT OF SEDIMENTATION RESURVEY CANTON RESERVOIR |
|
[REPORT "FORT BELVOIR ENGINEER SCHOOL LIBRARY DEPARTMENT PERIOD 1 JULY TO 31 DECEMBER 1949"] |
|
[REPORT] THE STUDY OF THE APPLICABILITY OF THE SEISMIC METHOD FOR THE DETERMINATION OF THE UPPER SURFACE OF PERMAFROST |
|
[COVER] 73RD ENGINEER COMBAT BATTALION S-2 JOURNAL [WITH ATTACHMENT] |
|
[REPORT "CALENDAR YEAR NARRATIVE REPORT FOR 1950"] |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING CONSTRUCTION OF METAL MIRROR FACTORY (ESTIMATED COST $200,000.000) AT CINCINNATI, OHIO (ENGINEERING CORPS PROJECT)] |
|