[COPY][ENVELOPE REGARDING FIXED BRIDGES OVER THE RHINE RIVER FROM BONN TO WORMS [WITH ATTACHMENTS] |
|
[TABLE] MAN HOURS EXPENDED ON THE PROJECT |
|
[REPORT] CARD-INDEXING AND FILING OF INFORMATION PERTINENT TO MILITARY HYDROLOGY |
|
[PROGRAM] SOIL MECHANICS COURSE 17A |
|
[MEMORANDUM FROM STYLER TO VARIOUS REGARDING ORGANIZATION MANUAL FOR THE CONSTRUCTION DIVISION][WITH ATTACHMENT] |
|
INFORMATION BULLETIN NO. 36 |
|
[MEMORANDUM NO. 11 REGARDING NOTES ON DEFENSE OF AIRDROMES][WITH ATTACHMENT] |
|
[TABLE] TABLE 1 CHARACTERISTICS OF THE TEST SOILS USED IN THE FULL-SCALE COMPACTION STUDIES [WITH ATTACHMENTS] |
|
[BOOKLET] CONCEALMENT FROM THE AIR VIEW, CAMOUFLAGE PAMPHLET NO.1 |
|
[REPORT] MILITARY GEOLOGY OF THE WEST POINT AREA, NEW YORK |
|
[REPORT "FORT BELVOIR ENGINEER SCHOOL DEPARTMENT OF TOPOGRAPHY PERIOD 1 JULY TO 31 DECEMBER 1949"] |
|
[REPORT] AIRFIELD CONSTRUCTION ARCTIC AND SUB-ARCTIC REGIONS, ALASKA |
|
[COPY][DIAGRAM OF 180TH STATION HOSPITAL BOUSSIVILLE] [WITH ATTACHMENT] |
|
[REPORT] OPERATIONS OF THE 40TH ENGINEER COMBAT GROUP IN THE RHINELAND 1945 |
|
[LIST] MAJOR EQUIPMENT USED ON PROJECT |
|
ENGINEER INTELLIGENCE MEMORANDUM NO. 28 |
|
[MEMORANDUM FROM WAR DEPARTMENT TO CHIEF, SUPPLY DIVISION REGARDING MAINTENANCE OF ENGINEER EQUIPMENT] |
|
[CORRESPONDENCE FROM CAPTAIN CONRAD A. SMITH TO UNDETERMINED REGARDING HISTORICAL REPORT] |
|
[CORRESPONDENCE FROM WALTER P. LEBER TO FOURTH ARMY REGARDING UNIT SCHOOLS, 46TH ENGINEER CONSTRUCTION BATTALION |
|
[CORRESPONDENCE FROM PHILIP R. GARGES REGARDING OPERATIONAL FUNCTIONS] |
|