[REPORT] CALENDAR YEAR NARRATIVE REPORT - 1950 |
|
[REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWINGS - PLATES 42 - 72] |
|
ENGINEER PERIODIC OPERATIONS REPORT NUMBER 28 |
|
[REPORT "MASTER TRAINING SCHEDULES (ATP'S 21-114 AND 5-600)"] |
|
REPORT ON UTILITIES, OSAKA-KOBE-KYOTO AREA JAPAN |
|
[REPORT] ENGINEER OUTLINE PLAN FOR ASSAULT CROSSING OF RHINE RIVER (MAP TO ACCOMPANY) |
|
[CORRESPONDENCE FROM PHILIP R. GARGES REGARDING OPERATIONAL FUNCTIONS] |
|
[COPY] [MEMORANDUM FROM HEADQUARTERS, 7TH ENGINEER BATTALION TO COMMANDING GENERAL REGARDING AFTER ACTION AGAINST THE ENEMY REPORT] |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING CONSTRUCTION SERVICES FOR CONSTRUCTION OF A CANTONMENT CAMP; REPLACEMENT CENTER AT FORT MONMOUTH, NEW JERSEY] |
|
[REPORT "CALENDAR YEAR NARRATIVE REPORT FOR 1950"] |
|
[REPORT "ENGINEER HISTORY (FIRST ARMY) OF THE NORTH AMERICAN CAMPAIGN NOVEMBER 42 TO MAY 43"] |
|
[COPY][ENVELOPE REGARDING FIXED BRIDGES OVER THE RHINE RIVER FROM BONN TO WORMS [WITH ATTACHMENTS] |
|
[MAP] EASTERN NEW GUINEA NAVIGATION CHART |
|
TECHNICAL TRAINING BULLETIN NO. 35 |
|
[REPORT] PROJECT MINT JULEP |
|
[CORRESPONDENCE FROM COLONEL ARTHUR F. MUSGRAVE TO UNDETERMINED REGARDING NARRATIVE HISTORICAL REPORT HEADQUARTERS AND HEADQUARTERS COMPANY 346TH ENGINEER COMBAT GROUP - YEAR 1949] |
|
[COVER] EIGHTH ARMY TRAINING AIDS CENTER |
|
ENGINEER INTELLIGENCE SUMMARY NO. 35 |
|
[LIST] MATERIALS SALVAGED AFTER CONSTRUCTION OF SU SONG BRIDGE |
|
[OUTLINE] EXERCISE POROS, DS NOTES TO REQUIREMENT I |
|