[BOOKLET] ENGINEER INTELLIGENCE NOTES NO. 24, PRIME MOVERS FOR HEAVY CONSTRUCTION EQUIPMENT |
|
[BOOKLET] ENGINEER INTELLIGENCE NOTES NO. 30, SHORT-SPAN PRESTRESSED CONCRETE BRIDGES |
|
[REPORT] OPERATIONS ORDERS INITIATING WORK |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING CONSTRUCTION SERVICES FOR CONSTRUCTION OF A 1,000-BED GENERAL HOSPITAL AT NEW ORLEANS, LOUISIANA] |
|
[REPORT] PLAN FOR RHINE RIVER CROSSINGS BETWEEN WESEL AND DINSLAKEN |
|
[REPORT "SCHEDULE 5- FORT BELVOIR ENGINEER SCHOOL CAPITAL [PLAYER] (ASSETS"] |
|
[REPORT "STATEMENT HQS. PERSONNEL SUPPORTED BY THE ENGINEER SCHOOL UNDER PROJECT P 510-01"] |
|
[COVER] FINAL HISTORY, 46TH ENGINEER CONSTRUCTION BATTALION |
|
ENGINEER INTELLIGENCE SUMMARY NUMBER 15 |
|
[MEMORANDUM FROM CAPTAIN THOMAS G. JONES TO COMMANDING OFFICER [OF] 1169TH ENGINEER COMBAT GROUP REGARDING COMMAND REPORT] |
|
[DIAGRAM] AS BUILT PLANS OF CHUNCHON HWY. BRIDGE CS - 8994 [WITH ATTACHMENTS] |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING CONSTRUCTION SERVICES FOR NEW CONSTRUCTION; IMPROVING EXISTING FACILITIES AT PICATINNY ARSENAL, DOVER, NEW JERSEY] |
|
[NEGATIVE COPY] REPORT ON DEFENSE CONSTRUCTION ACTIVITIES, OCTOBER 1 - DECEMBER 31 1941 |
|
[REPORT] HISTORY OF ORGANIZATION FOR 1949 (WDSHD - 2) |
|
[REPORT] XV CORPS OUTLINE PLAN OPERATION "UNDERTONE" PHASE TWO [WITH ATTACHMENTS] |
|
[MEMORANDUM FROM COLONEL S.T.B. JOHNSON TO ASSISTANT COMMANDANT, TES REGARDING A STUDY OF THE BRANCH SCHOOLING OF AN OFFICER OF THE CORPS OF ENGINEERS][WITH ATTACHMENT] |
|
ENGINEER PERIODIC OPERATIONS REPORT NUMBER 2 |
|
[REPORT] RHINE CROSSING BY THE 79 INFANTRY DIVISION |
|
[CORRESPONDENCE FROM DODDLERIDGE TO THE ADJUTANT GENERAL REGARDING HQS RESERVE COMMAND] |
|
[REPORT "FORT BELVOIR ENGINEER SCHOOL - REPRODUCTION -"] |
|