FINAL TECHNICAL REPORT - TUNNEL REHABILITATION, METHODS AND EQUIPMENT |
|
[MEMORANDUM FROM WAR DEPARTMENT, OFFICE OF THE CHIEF OF ENGINEERS TO GENERAL KINGMAN REGARDING WEEKLY REPORT OF ACTIVITIES OF FORTIFICATION SECTION] |
|
[BOOKLET] ENGINEER INTELLIGENCE NOTES NO. 20, SOVIET MINE WARFARE DOCTRINE, TACTICS, AND TECHNIQUES |
|
[REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "TABLE OF COMPONENTS FOR 1 NO. V-TRESTLE GANTRY" TABLE 29] |
|
[REPORT] CROSSING OF THE RHINE RIVER |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING ARCHITECTURAL; ENGINEERING SERVICES FOR CONSTRUCTION OF A DIVISIONAL TENT CAMP AT ABILENE, TEXAS] |
|
[REPORT] PLAN FOR RHINE RIVER CROSSINGS BETWEEN WESEL AND DINSLAKEN |
|
[MAP OF CONSTRUCTION AT AIR CORPS STATIONS, PART 1- AIR FORCE COMBAT COMMAND STATIONS][WITH ATTACHMENTS] |
|
[COPY][BLUEPRINTS FOR 25000 GAL REINFORCED CONCRETE WATER STORAGE TANK, KAPYONG, " AS BUILT"] |
|
[MEMORANDUM FROM COLONEL C.V. RUZEK, JR. TO LIEUTENANT COLONEL LEO E. DUNHAM, JR. REGARDING REQUEST FOR COPIES OF PRE-ASSIGNMENT EXAMINATIONS FOR COMMAND AND GENERAL STAFF COLLEGE] |
|
OBSERVER COMMENTS OPERATION RAIDER |
|
ENGINEER INTELLIGENCE MEMORANDUM NUMBER 28 |
|
[REPORT] UNIT HISTORY HEADQUARTERS, HEADQUARTERS SV COMPANY 463 ENGR (C) ENGLISH FROM 24 FEBRUARY 1947-1 JANUARY 1950 |
|
[REPORT "ENGINEER INTELLIGENCE SUMMARY NO 36"] |
|
[REPORT] PROJECTION COMPLETION REPORT - MUNMANG-NI BRIDGE [WITH ATTACHMENTS] |
|
[REPORT] HISTORICAL DOCUMENT, HIGHWAY BRIDGE CS5871 ROUTE 18 SEOUL CHUNCHON [WITH ATTACHMENT] |
|
[COPY] SPECIAL ORDERS NUMBER 1 |
|
[CORRESPONDENCE FROM JOHN F. KIMBEL TO U.S. ARMY ENGINEER SCHOOL REGARDING ROYAL ENGINEERS SCHOOL OF MILITARY ENGINEERING] |
|
[MEMORANDUM FROM CHIEF, CONSTRUCTION DIVISION TO CONSTRUCTION ADVISORY BRANCH ADMINISTRATION DIVISION REGARDING CONSTRUCTION SERVICES FOR THE CONSTRUCTION OF A GENERAL HOSPITAL AT CAMP DIX, NEW JERSEY] |
|
TRAINING CIRCULAR NO. 4 |
|