[LIST] LIST OF ACTIVITIES AND INSTALLATIONS |
|
[COPY] [REPORT] MEDICAL OFFICER'S SHIFT REPORT |
|
[CORRESPONDENCE FROM LIEUTENANT COLONEL M. E. WHITTEN TO CHEMICAL OFFICER, VII CORPS, APO 307, U.S. ARMY REGARDING COLORED SMOKE GRENADES] |
|
[GRAPH ILLUSTRATING THE HYDROLYSIS OF MUSTARD GAS] |
|
[CORRESPONDENCE FROM G. ANTONOFF TO J. E. MILLS REGARDING GAS RESPIRATORS] |
|
[COPY] [COVER PAGE] THE DM PLANT - 1939 DESIGN [WITH ATTACHMENTS] |
|
[REPORT] CHEMICAL WARFARE SERVICE, UNITED STATES ARMY, PRODUCTION DATA PERTAINING TO MANUFACTURE OF METAL EYE-RINGS FOR GAS MASKS |
|
[MANUAL] WAR PLAN THE EDGEWOOD GAS MASK ASSEMBLY PLANT, PART VII, MATERIALS INSPECTION, VOLUME 1 |
|
[CORRESPONDENCE FROM COLONEL JAMES D. O'BRIEN TO COMMANDING GENERAL, ARMY GROUND FORCES, ARMY WAR COLLEGE, WASHINGTON D.C. REGARDING AGF REPORT NO. 774 - COLORED SMOKE GRENADES] |
|
[LIST] CHEMICAL WARFARE SERVICE OFFICERS ASSIGNMENTS, OC CWS, GRAVELLY POINT |
|
[PHOTOGRAPH OF A GROUP OF MEN STANDING ABOARD A SHIP WATCHING A CRANE DROP MATERIALS ONTO IT] |
|
[REPORT] WAR PLAN [PART 1 OF 2] |
|
[REPORT] WAR PLAN |
|
[REPORT] THE EDGEWOOD GAS MASK ASSEMBLY PLANT PLAN, PART V, ASSEMBLY, PACKING AND SHIPPING DEPARTMENT |
|
[FIGURES 9 AND 10, DRAWINGS OF PIECES OF A MACHINE/WEAPON] |
|
[REPORT] CHEMICAL WARFARE SERVICE, UNITED STATES ARMY, PRODUCTION DATA PERTAINING TO MANUFACTURE OF GAS MASK CARRIER, MIIIA1 |
|
[CORRESPONDENCE FROM COLONEL PATRICK F. POWERS TO VARIOUS REGARDING COLORED SMOKE GRENADES] |
|
[BOOKLET] DIRECTIVE FOR THE CAREER CLASS WRITING PROGRAM FIFTEENTH CHEMICAL OFFICER CAREER COURSE |
|
[BOOK] ARMY SERVICE FORCES CHEMICAL WARFARE SERVICE MUNITIONS INSPECTION HANDBOOK STANDARD INSPECTION PROCEDURES |
|
[BOOK] CHEMICAL CORPS MAINTENANCE AND SUPPLY IN THE FIELD |
|